One of those cantons is Grecia, where the Evolution Free Zone project is located. The park has direct access to Route 1, one of the most important highways in the country and used by around 90,000 vehicles on a daily basis.This location has direct effects on the population that drive through this route daily. Nowadays, Route 1 is used on a daily basis by around 90,000 vehicles in both directions.
CODE Development Group, with more than 20 years of experience in the development of industrial parks, has created a comprehensiven entire strategic plan to improve mobility in the section directly in the area of influence, donating vital infrastructure to the country. reduce the issues that people could face when moving along the section of road where the construction of the industrial park is taking place.
Speaking about road design, we are making a tangible improvement to this section of Route 1, going from having two lanes (one for each direction) to four (two for each direction), in addition to a bridge. This is a great contribution to the national infrastructure, one that we area very excited to give to our country”, says Carlos Wong, President of CODE Development Group
Additionally, the engineering team in charge has contemplated having an additional lane at the entrance of the Free Zone, to avoid a congestion of vehicles going in and out of the Free Zone, also including two side areas that come from the main route.
This part of the route will end up being incorporated into the national structure that currently exists and which already depends on the Government. For our part, we want to guarantee the commitment of CODE Development Group and the team in charge of the construction of Evolution Free Zone with the improvement of the road, helping drivers in this section of direct influence of the park to move in the best possible way”, adds Wong
Apart from the actions mentioned above, the team at of Evolution Free Zone has carried out a whole strategic relations plan with the surrounding communities, which objective is to inform residents and local organizations about the mobility changes on Route 1 as well as the short and medium-term benefits of this impact.
“When we say we want to see progress in the Western region, we really mean it. This implies that even during the construction stage, the local residents are not going to see their routine affected by vehicle congestion in various sections of the route”.
On our end, we are not going to stop traffic on Route 1 at any time, except when we have to assemble the bridge. However, the plan is to perform this work at night and giving prior notice to the community, considering risk factors. This work will also be coordinated with the relevant authorities”, concludes Wong
The developers hope to start work around the beginning of May 2023, so they are urging citizens to stay tuned to the different communication channels that Evolution Free Zone will make available to them.